Definitions

 

 

Throughput (TH)

Production rate-determined by the processing duration at the bottleneck(s)

Cycle Time (CT)

Time required for a single unit of product to transit the system=sum of processing durations + sum of queue, inspection, moving times

Work-in-Process (WIP)